What should a clothing brand approve before pajama bulk production starts?
A production handoff turns an approved sample into one controlled order reference. It connects the style, fabric, measurements, quantities, branding, packing, quality plan, payment and shipment release.
Download the pajama production handoff checklist
Record the approved version, status, owner, deadline, factory confirmation and buyer approval. Keep unresolved points marked pending.
Download the production handoff checklist ↗The nine gates before bulk production
| Gate | What to control | Evidence |
|---|---|---|
| Commercial order | Style, colour, quantity, size split, price and terms | Current approved record |
| Approved sample | Construction, fit and approved exceptions | Current approved record |
| Measurements | Methods, targets, tolerances and grading | Current approved record |
| Materials | Fabric, colour, finish, trims and availability | Current approved record |
| Branding | Labels, artwork, barcodes and packaging | Current approved record |
| Quality plan | Checks, method and disposition route | Current approved record |
| Schedule | Start trigger, milestones and dependencies | Current approved record |
| Balance release | Production photos/videos and payment | Current approved record |
| Shipment | Carton marks, documents and dispatch | Current approved record |
1. Freeze the commercial order
Confirm style, colourways, quantity per style and colour, size breakdown, price, payment terms and destination. Standard MOQ is 100 pieces per style per colour. The actual quotation follows the style, fabric and process.
2. Identify the approved product reference
Name the approved sample version and link it to current construction details, measurement chart and comment history. Record accepted exceptions and mark superseded files.
3. Approve fabric, colour and trims
Record composition, construction, weight, stretch, finish, colour reference and approval requirements. List all trims. Availability and separate supplier minimums are confirmed against the brief.
4. Freeze measurements and grading
Use the brand-approved finished-garment chart with point codes, methods, targets, tolerances and grade rules. A general market size reference is not a production chart.
5. Approve labels, packaging and SKU data
Provide final artwork, wording, dimensions, material, colour and placement. Confirm folding, bags, stickers, barcode data, assortments and carton marks. The brand or importer confirms destination-market requirements.
6. Close open points with owners and deadlines
List unresolved decisions, requested changes and accepted deviations. Give each an owner, due date and status. Do not treat silence as approval.
7. Confirm the production start trigger and timing
Bulk timing begins after receipt of the 70% deposit: 15–25 calendar days for simple styles and 20–35 for complex styles, subject to confirmed materials, approvals and order plan.
8. Define quality checks and release evidence
Agree checks, targets, inspection method, defect handling and exception authority. Before shipment, production photos and videos are provided and the remaining 30% is payable. Third-party inspection applies only when separately agreed.
9. Release packing and shipment
Confirm packed quantities, assortments, carton marks, documents, shipping method, consignee data and booking responsibilities.
Who owns each part?
The buyer supplies and approves the brand brief, design intent, measurements, artwork, market requirements and commercial decisions. The factory reviews feasibility, records the agreed product, confirms sourcing and timing, manufactures against the approved reference and supplies agreed release evidence.
Review sample approval →Prepare the fabric specification →Approve labels and packing →PREPARE THE BULK HANDOFF
Send one current order reference.
Jamie can review your approved sample, specification, quantities, branding and schedule inputs.
Send your project brief ↗Review manufacturing →Review quality control →