1. Choose a supplier & prepare a quote
Compare manufacturing capability, plan quantities and assemble the information needed for a useful quotation.
BUYER GUIDES
Practical guides for preparing a clearer brief, comparing samples and defining a product specification.
FIND YOUR NEXT STEP
Start with the decision in front of you, then use the detailed checklists to prepare your factory brief.
Compare manufacturing capability, plan quantities and assemble the information needed for a useful quotation.
Define the fabric and garment specification, record changes and agree the reference for production.
Keep approved specifications, inspection findings and packing instructions connected through the handoff.
Need a sleepwear production partner? Verify our Dongguan factory → · Review custom development → · Review private-label production →
Ready to discuss your collection? Send your project brief →
PACKING HANDOFF / 14
Prepare barcode data, packing rules, carton marks, quantities, documents and dispatch approval with a free CSV.
Use the packing checklist ↗SHIPMENT RELEASE / 13
Control specifications, workmanship, measurements, packing, corrections and shipment approval with a free CSV.
Use the inspection checklist ↗TIMELINE PLANNING / 11
Build the order schedule around confirmed inputs, approvals and payment triggers.
Read the timeline guide ↗PRODUCTION HANDOFF / 12
Control product, materials, branding, quality, payment and shipment with a free CSV.
Use the handoff checklist ↗MEASUREMENT CONTROL / 11
Define points, methods, targets, tolerances, measured results and approval status with a free CSV.
Use the measurement guide ↗FABRIC SPECIFICATION / 10
Define composition, construction, weight, stretch, colour, finish, testing and approval with a free CSV.
Use the fabric specification guide ↗QUALITY PLANNING / 09
Use one controlled production reference for fabric, measurements, labels, packing and inspection.
Read the quality-control checklist ↗MARKET PREPARATION / 09
Organise labels, care information, testing and packaging requirements before development.
Use the market brief ↗RFQ PLANNING / 08
Define product, fabric, sizes, quantities, branding, market and sample needs.
Use the RFQ checklist ↗PRIVATE LABEL / 07
Control brand labels, care content, barcodes, packing artwork and the final handoff.
Use the buyer checklist ↗FABRIC DECISION / 06
Compare fit, construction, specification inputs and sample risks before sourcing.
Read the sourcing guide ↗SAMPLE REVIEW / 05
A practical checklist for fit, measurements, fabric, details and production handoff.
Read the approval checklist ↗ORDER PLANNING / 04
Plan styles, colours and mixed sizes with practical order examples.
Read the MOQ guide ↗FREE BUYER TOOL / 03
Download a structured CSV and turn fit reactions into measurable factory instructions.
Use the free template ↗BUYER GUIDE / 02
Use 12 questions to compare capability, MOQ, samples, fabrics, labels, QC and production terms.
Read the buyer guide ↗DEVELOPMENT NOTES / 01
A practical checklist for communicating sleepwear specifications before development.
Read the tech pack guide ↗LET’S DEVELOP YOUR COLLECTION
Choose the sourcing route before comparing a factory quotation.
Compare the sourcing routes →