NAIDI PAJAMAS

MANUFACTURING / THE PROCESS

OEM and ODM sleepwear manufacturing.

Choose the development route that matches the information you already have. We review the garment brief, materials, measurements and branding before sampling, then work from the agreed production specification.

OEM / ODM

Choose your starting point.

Discuss your manufacturing brief

FROM DESIGN TO SHIPMENT

Six stages.
One considered process.

Clear decisions at each step, with your approved specification guiding the work.

01 / BRIEF

Define product, market and commercial scope

Share style, target market, quantity, sizes, material direction, branding, date and reference files.

02 / SOURCING

Confirm fabric, colour and trims

Align composition, construction, weight, stretch, finish, colour and trims. Availability and cost follow the brief.

03 / SAMPLE

Develop pattern, sample and specification

Sample fees are paid in full. Timing begins after payment: 7–12 calendar days for simple styles and 15–20 for complex styles. A revised sample is 70% of the original sample fee.

05 / BULK

Start production after the confirmed deposit

Bulk orders require a 70% deposit. Timing begins after receipt: 15–25 calendar days for simple styles and 20–35 for complex styles.

06 / RELEASE

Check, pack and release shipment

Production photos and videos are provided before shipment; the remaining 30% is payable before shipment.

WORKING RESPONSIBILITIES

One handoff, with clear owners.

Responsibilities are confirmed for each order.

AreaBuyer / brandFactory
BriefProvide intent and requirementsReview feasibility
MaterialsDefine and approveSource/review and confirm cost
MeasurementsProvide and approve chart and fitDevelop sample and record results
BrandingProvide artwork and market requirementsFollow approved files
QualityApprove standards and exceptionsApply controls and record findings
ScheduleMeet payment triggersConfirm dependencies and evidence

Third-party testing or inspection is included only when separately agreed.

EXPLORE THE SERVICES

FINAL PACK-OUT HANDOFF

Connect the approved garment to the buyer's packing brief.

Before release, align unit presentation, carton assortments, carton marks, quantities and packing-list data with the approved style and destination requirements. Review owner-supplied factory photographs of carton sealing and organised packed goods as work-context evidence only; they do not identify a customer, brand, order quantity, packing specification or shipment destination.

View real carton preparation in the factory → Use the carton packing handoff checklist →

PAYMENT & TIMING

Planning your order

Sample development fees are payable in full. Bulk orders require a 70% deposit, with the remaining 30% payable before shipment after production photos and videos are provided. Sampling: 7–12 calendar days for simple styles and 15–20 for complex styles, starting after full payment of the sample fee. Bulk production: 15–25 calendar days for simple styles and 20–35 for complex styles, starting after receipt of the 70% deposit.

MANUFACTURING QUESTIONS

Planning pajama production.

Should I choose OEM or ODM if my sleepwear tech pack is incomplete?

Choose the route by the decisions still open. OEM suits a defined design that needs feasibility review and agreed specification details; ODM suits a collection that still needs style, material or fit development. Send your current files with a list of approved details and unresolved questions so the development scope can be agreed before sampling.

Compare OEM pajama manufacturing and ODM sleepwear development, then use the design brief checklist to organise your inputs.

What should a brand do if a specification changes after sample approval?

Identify the changed detail, affected styles and latest file version. Ask the factory to confirm any effect on materials, fit, cost, inspection and the production schedule before authorising the change. If fit or construction changes, agree whether another sample is needed. Keep revised approval with the order record so production does not follow an outdated file.

Use the production handoff checklist to connect the sample, specifications and approval record. Revision scope, fees and timing must be confirmed for the actual order.

What is the MOQ?+

100 pieces per style per colour.

When does sample timing begin?+

After full sample fee payment: 7–12 calendar days for simple styles and 15–20 for complex styles.

When does bulk timing begin?+

After the 70% deposit: 15–25 calendar days for simple styles and 20–35 for complex styles.

What is approved before bulk?+

Sample, measurements, materials, quantities, branding, quality plan, schedule and terms.

When is the balance paid?+

The remaining 30% is paid before shipment after production photos and videos are provided.

Send your manufacturing brief →

LET’S TALK ABOUT YOUR COLLECTION

Request a quote.

Tell Jamie what you have in mind. Minimum order: 100 pieces per style per colour.

Open the full enquiry form →

Prepare the pre-shipment inspection → Send the project brief →

Prepare the carton and shipping handoff → Send the project brief →

Planning a sourcing trip to Guangdong?

Meet our team in Dongguan to discuss your sleepwear collection, fabric direction and production requirements. Visits are by appointment and subject to confirmation.

Before booking, review the factory identity and owner-supplied production photographs in the context of your own supplier review.

Request a factory visit during your Canton Fair sourcing trip →